Location ■ Charles City County, Virginia
Commercial operation date ■ 1H2024 (targeted)
Energy market / Capacity market ■ PJM Dominion Zone / PJM RTO
Capacity (Winter / Summer)

■ At 22° Output = 1,780 MW

■ At 40° Output = 1,740 MW

■ At 92° Output = 1,672 MW

Key equipment

■ (3) M501JAC in single shart with steam turbines

■ (3) Triple-pressure reheat Heat Recovery Steam Generators ("HRSG")

■ (3) Air-cooled steam condensers ("ACC")

Fuel ■ Natural gas
Guaranteed heat rate ■ 6,300 Btu/kWh
Capacity factor ■ ~90% (Baseload supply service, backstop for renewables)
Electrical interconnection ■ Dominion Virginia Power (DVP) Chickahominy 500kV Substation (adjacent to Facility)
Gas interconnection ■ Transco via purpose built gas lateral
Site area ■ 186 acres
Data Center growth is a key demand driver