Location | ■ Charles City County, Virginia |
Commercial operation date | ■ 1H2024 (targeted) |
Energy market / Capacity market | ■ PJM Dominion Zone / PJM RTO |
Capacity (Winter / Summer) |
■ At 22° Output = 1,780 MW ■ At 40° Output = 1,740 MW ■ At 92° Output = 1,672 MW |
Key equipment |
■ (3) M501JAC in single shart with steam turbines ■ (3) Triple-pressure reheat Heat Recovery Steam Generators ("HRSG") ■ (3) Air-cooled steam condensers ("ACC") |
Fuel | ■ Natural gas |
Guaranteed heat rate | ■ 6,300 Btu/kWh |
Capacity factor | ■ ~90% (Baseload supply service, backstop for renewables) |
Electrical interconnection | ■ Dominion Virginia Power (DVP) Chickahominy 500kV Substation (adjacent to Facility) |
Gas interconnection | ■ Transco via purpose built gas lateral |
Site area | ■ 186 acres |